Petrochemical & Natural Gas

Explosion-proof protection for extreme heat and corrosion, covering refineries and gas facilities

Power & Energy

High-voltage grid and solar grounding systems across deserts and rainforests

Transportation

Zero-interruption operation for cross-border HSR and heavy-haul railways

Infrastructure

System-level protection for commercial centers, stadiums, and data centers

Power & Energy Projects
Back to Projects
Power & Energy

High-Voltage Grid & Solar Grounding Across Deserts & Rainforests

UHV substation protection and grid-scale grounding for national power infrastructure. Serving 65+ projects across 12 countries.

65+
Projects
12
Countries

Three Landmark Projects

Explore our landmark projects in the power & energy sector

Al Dhafra 2.1GW Solar PV Plant, UAE
2023
UAE

Al Dhafra 2.1GW Solar PV Plant, UAE

Background: Leading solar benchmark project in the Middle East and globally for single-unit capacity. Owner: TAQA / Masdar / EDF / Jinko Power, EPC: CEEC, Design: CEEC NWPDI.

Highlight: Successfully solved grounding resistance stability challenges under extreme arid desert conditions.

2.1 GW
Capacity
TAQA/Masdar
Owner
CEEC
EPC Contractor

Challenges

  • Extreme arid desert conditions
  • Grounding resistance stability
  • High standards for global benchmark project

Solutions

  • Solutions for extreme arid desert environment
  • Grounding resistance stability assurance
  • Global benchmark-level protection system

Results

  • Desert environment grounding resistance stabilized at 0.5Ω
  • Solar array lightning protection system passed acceptance on first attempt
  • System operating safely for 1 year with zero failures
Hassyan Clean Coal/Gas Power Plant, Dubai
2023
Dubai

Hassyan Clean Coal/Gas Power Plant, Dubai

Background: First clean coal power plant in the Middle East under the Belt and Road framework, EPC by Harbin Electric.

Highlight: Provided grounding network deepening design support compliant with Middle East grid standards and high-standard copper-clad steel supply.

2400 MW
Capacity
Harbin Electric
EPC Contractor
Fully Connected
Status

Challenges

  • Middle East grid standard compliance
  • Special protection requirements for clean coal power plant
  • High-standard copper-clad steel supply

Solutions

  • Grounding network deepening design support
  • High-standard copper-clad steel material supply
  • Compliant with Middle East grid standards

Results

  • Grounding network resistance achieved 0.3Ω design requirement
  • 2400MW units fully connected to grid
  • Compliant with Middle East grid standard certification
Saudi Al Shuaibah 2.6GW Solar PV Project
2024
Saudi Arabia

Saudi Al Shuaibah 2.6GW Solar PV Project

Background: Largest single-unit solar power plant under Saudi Vision 2030 framework. Owner: ACWA Power / PIF (Saudi Sovereign Fund), EPC: CEEC, Design: CEEC NWPDI.

Highlight: Provided low-cost, high-efficiency lightning protection grounding centralized procurement solution for 2GW+ large-scale arrays.

2.6 GW
Capacity
ACWA/PIF
Owner
CEEC
EPC Contractor

Challenges

  • Protection for 2GW+ large-scale arrays
  • Low-cost high-efficiency solution
  • High standards for Saudi Vision 2030

Solutions

  • Large-scale array lightning protection grounding solution
  • Low-cost high-efficiency centralized procurement supply
  • Compliant with Vision 2030 standards

Results

  • 2.6GW solar array lightning protection system delivered
  • Grounding resistance achieved 0.4Ω design standard
  • Project achieved commercial operation on schedule

Explore Other Industries

View our projects in other industries

Have a Power & Energy Project?

Contact us for professional high-voltage grid and renewable energy lightning protection solutions

Submit Project Inquiry

WhatsApp

Chat on WhatsApp

Go to Contact Page

Email

sales@wuxigreen.com

Go to Contact Page

Back to Top

Return to page top

Go to Contact Page